PHYTO RESEARCH CASE STUDY – Pinehurst Hotel Dry Cleaners

PHYTO RESEARCH CASE STUDY – Pinehurst Hotel Dry Cleaners

PHYTOREMEDIATION RESEARCH CASE STUDY  Project Name: Pinehurst Hotel Dry Cleaners  (ATC 2013) (Sand Creek 2013) Location:  Pinehurst, North Carolina Consultants/ Scientists:  Sand Creek Consultants, Wisconsin and ATC Associates, North Carolina Date installed:  2010...

PHYTO RESEARCH CASE STUDY – Travis Air Force Base

PHYTOREMEDIATION RESEARCH CASE STUDY: Chlorinated Solvents Project Name:  Travis Air Force Base (Klein, 2011) (Doucette et al 2013) (Parsons, 2010) Caption:  Gaseous TCE releases from trees and soil surface into the atmosphere were measured on this site to determine...
PHYTO – Case Study – Ford Motor Company Factory

PHYTO – Case Study – Ford Motor Company Factory

Project Name:  Ford Motor Company Factory (Barac et al 1999) Location: Genk, Belgium Scientists: Tanja Barac (a); Nele Weyens (a); Licy Oeyen (a); Safiyh Taghavi (b); Daniel van der Lelie (b); Dirk Dubin (c); Marco Spliet (d); Jaco Vangronsveld (a) Institutions: (a)...
Prepping Site for a Phytobuffer

Prepping Site for a Phytobuffer

Offshoots, Inc is preparing a phytobuffer site. At a family-owned natural stone supplier, Offshoots’s team is taking down a small set of Spruce to clear the way for poplars to protect the site and groundwater from a petroleum leak that occurred on the site. High...